Project References -
TREATMENT & DISPOSAL
Treatment and
Recovery of Sludge: NLNG
|
Assignment Name:
Treatment and disposal of waterworks sludge |
Country:
Nigeria |
|
Location within
Country:
Bonny, Rivers state |
Professional Staff
Provided by Firm/Entity:
The
Initiates ltd |
|
Name of Client: NLNG |
No. of Staff:
2 |
|
Address:
Bonny |
Staff Months: 0.1
Duration Of
Assignment:
Running contract |
|
Start Date
(month/year)
1999 |
Completion Date
(month/year)
Running contract |
Approx. value of
services (in current Naira):
depends on waste generated
|
|
Name Of Associate
Consultants, If Any:
Nil |
No. of months of
Professional staff provided by associate consultants:
Nil |
|
Name of Senior Staff
(Project Director (PD)/Co-ordinator, Team Leader)
involved & functions performed:
Jegede, Margaret. |
|
Narrative Description of Project:
This project involved compositional analysis, fixation
matrix design and fixation of waterworks sludge. The
fixation products are construction blocks determined to
have no significant environmental impact through
leachability test |
|
Remark: Completed |
|
Description of actual
services provided by The Initiates Ltd staff (as
above) |
| |
|
|
Name
of references
-
Akpabio Esien, NLNG. Bonny
Phone No.: 232900 ext 3351
-
Eldred Nwabufo, NLNG. Bonny
Phone No.: 232900 ext 3440
Waste
Management: DAEWOO NIG
|
Assignment Name:
Waste management |
Country:
Nigeria |
|
Location within
Country:
Rivers state |
Professional Staff
Provided by Firm/Entity:
The
Initiates ltd |
|
Name of Client:
Daewoo Nig. Ltd |
No. of Staff :
7 |
|
Address:
Rivers state |
Staff months:
Nil
Duration of
Assignment:
Running contract |
|
Start Date
(month/year)
October 1999 |
Completion Date
(month/year)
Running contract |
Approx. value of
services (in current Naira):
Running contract
|
|
Name Of Associate
Consultants, If Any:
Nil |
No. of months of
Professional staff provided by associate consultants:
Nil |
|
Name of Senior Staff
(Project Director (PD)/Co-ordinator, Team Leader)
involved & functions performed:
R.M. Ossai |
|
Narrative
Description of Project: This project involves the collection, treatment/ recycling and
disposal. |
|
Remark:
Running |
|
Description of actual
services provided by The Initiates Ltd staff (as
above) |
| |
|
|
Name
of references
1. Mr. Solomon Akeh
Tel: 08033415611
2. Mr. J. S Kim
087-770518
Evacuation & Disposal of Biodegradable Solid Waste (non-incinerable):
MOBIL Pro. Nig. Unltd Eket (PO No. 4500425385)
|
Assignment Name:
Evacuation & Disposal of Solid, Non-Incinerable &
Biodegradable Waste |
Country:
Nigeria |
|
Location within
Country:
Bonny, Rivers state |
Professional Staff
Provided by Firm/Entity:
The
Initiates ltd |
|
Name of Client: Mobil Nig. Unltd, Eket. |
No. of Staff:
5 |
|
Address:
QIT Eket, Akwa-Ibom State |
Staff months:
2.6
Duration of
Assignment:
2months |
|
Start Date
(month/year)
June, 2007 |
Completion Date
(month/year)
August, 2007 |
Approx. value of
services (in current Naira):
N
25.15M
|
|
Name Of Associate
Sub-contractor, If Any:
Trucking System Ltd |
No. of months of
Professional staff provided by associate contractor:
N0.07 |
|
Name of Senior Staff
(Project Director /Co-ordinator, Team Leader) involved &
functions performed:
Dr. Chima, C. O. :
Planning, administration |
|
Narrative Description of Project:
This project involved waste segregation, packaging and
labelling, disposal in Government approved dumpsite . |
|
Remark: Completed |
|
Description of actual
services provided by The Initiates Ltd staff (as
above) |
| |
|
|
Names
of reference
1. Samuel Umana
Tel:082-443523
2. Yusuf Mohammed
Tel. 01-2621740
Medical Waste
Disposal Services: SPDC Nig. Ltd. (No. EH9068)
|
Assignment Name:
Collection and Incineration of medical waste |
Country:
Nigeria |
|
Location within
Country:
Port Harcourt Sites |
Professional Staff
Provided by Firm/Entity:
The
Initiates ltd |
|
Name of Client: Shell Petroleum Development Company of Nigeria Ltd. |
No. of Staff :
14 |
|
Address:
SHELL EAST,
Port Harcourt |
Staff months:
Running
Duration of
Assignment: Term contract (1year) |
|
Start Date
(month/year)
March 2006 |
Completion Date
(month/year)
On-going |
Approx. value of
services (in current Naira):
N
0.9M/ monthly
|
|
Name Of Associate
Consultants, If Any:
Nil |
No. of months of
Professional staff provided by associate consultants:
Nil |
|
Name of Senior Staff
(Project Director (PD)/Co-ordinator, Team Leader)
involved & functions performed:
N.I. Enweliku. |
|
Narrative Description of Project:
This project involves bin disinfection, scheduling and
collection of filled bins, haulage to TIL Base for
incineration. It also involve stack emission monitoring. |
|
Description of actual
services provided by The Initiates Ltd staff (as
above) |
| |
|
|
Names of reference
1. Mokolo,G.
Tel: 0803500490
2. Agbapuronwo Morgan
Tel. 08023052564
 |
 |
|
Medical
Waste Disposal Services: SPDC Nig. Ltd.
|
Treatment and Disposal of Water Base Drill Cuttings: N.A.O.C.
Ltd.
|
Assignment
Name: Treatment and Disposal of Water Base Drill
Cuttings |
Country:
Nigeria |
|
Location
within Country: Kwale Well 15 & 16 |
Professional Staff Provided by Firm/Entity:
The Initiates ltd |
|
Name Of
Client: Nigeria Agip Oil Company |
No. of
Staff : 11 |
|
Address:
P.O.Box 923, Port Harcourt |
Staff
months: 4
Duration
of Assignment: 6 months |
|
Start Date
(month/year)
Nov, 2004 |
Completion
Date (month/year) April, 2005 |
Approx. value of services (in
current Naira):
N
31.12M
|
|
Name Of
Associate Consultants, If Any: Nil |
No. of
months of Professional staff provided by associate
consultants: Nil |
|
Name of
Senior Staff (Project Director/Coordinator, Team Leader)
involved & functions performed: Ossai, R.M. :
Fixation matrix design and project planning and
coordination |
|
Narrative Description of Project:
This project involved waste characterization, fixation
matrix design, solidification, and environmental &
engineering quality evaluation & monitoring.
|
|
Remark:
Completed |
|
Description
of actual services provided by The Initiates Ltd staff (as
above) |
| |
|
|
Names of reference
1. Engr. J. Onyia
Tel: 236400 ext 3328
2 Mr. Uzor V.I
Tel: 236400 ext. 3143
Waste
Oil Recycling: TSKJ and Others
|
Assignment
Name: Spent oil Regeneration |
Country:
Nigeria |
|
Location
within Country: Rivers state |
Professional Staff Provided by Firm/Entity:
The Initiates ltd |
|
Name of Client: TSKJ, Daewoo
Nig. Ltd, baker Nig Ltd, Remm oil services, Diesel Power
Nig. Ltd and others |
No. of
Staff : 4 |
|
Address:
Rivers state |
Staff
months: Nil
Duration
of Assignment: Running contract |
|
Start Date
(month/year)
October
1999 |
Completion
Date (month/year) Running contract |
Approx. value of services (in
current Naira):
Running contract
|
|
Name Of
Associate Consultants, If Any: Nil |
No. of
months of Professional staff provided by associate
consultants: Nil |
|
Name of
Senior Staff (Project Director (PD)/Co-ordinator, Team
Leader) involved & functions performed: H. Ihejirika |
|
Narrative Description of
Project: This project involves the dehydration of
spent oil and blending for fuel. |
|
Remark: Completed |
|
Description
of actual services provided by The Initiates Ltd staff (as
above) |
| |
|
|
Names of reference
1. Paul Thomas
Tel:084-232900 ext. 6722
2. David Maughan
Tel: 084-232900 ext. 8471
Medical
Waste Mgt. (Incineration): NAOC
|
Assignment
Name: Healthcare Waste management |
Country:
Nigeria |
|
Location
within Country: Port Harcourt |
Professional Staff Provided by Firm/Entity:
The Initiates ltd |
|
Name of
Client: Nig. Agip Oil Company |
No. of
Staff : 6 |
|
Address:
P.O.Box 923, Mile 4, Port Harcourt. |
Staff
months: Nil
Duration
of Assignment: Running contract |
|
Start Date
(month/year)
February
2001 |
Completion
Date (month/year) Running contract |
Approx. value of services (in
current Naira):
Running contract
|
|
Name Of
Associate Consultants, If Any: Nil |
No. of
months of Professional staff provided by associate
consultants: Nil |
|
Name Of
Senior Staff (Project Director (PD)/Co-Ordinator, Team
Leader) Involved & Functions Performed: Jegede,
Margaret. |
|
Narrative Description of
Project: This project involves collection and
incineration in our healthcare waste incinerator. |
| |
|
|
Names of reference
1. Engr. J. Onyia
Tel: 236400 ext 3328
2 Mr. Uzor V.I
Tel: 236400 ext. 3143
|
Assignment
Name: Evacuation & Disposal of Solid, Non-Incinerable
& Biodegradable Waste |
Country:
Nigeria |
|
Location
within Country: Bonny, Rivers state |
Professional Staff Provided by Firm/Entity:
The Initiates ltd |
|
Name of
Client: Mobil Nig. Unltd, Eket. |
No. of
Staff: 5 |
|
Address:
QIT Eket, Akwa-Ibom State |
Staff
months: 1
Duration
of Assignment: 2months |
|
Start Date
(month/year)
March,
2008 |
Completion
Date (month/year) March, 2008 |
Approx. value of services (in
current Naira):
N
9.15M
|
|
Name Of
Associate Sub-contractor, If Any: Trucking System
Ltd |
No. of
months of Professional staff provided by associate
contractor: N0.07 |
|
Name of
Senior Staff (Project Director /Co-ordinator, Team
Leader) involved & functions performed: Dr. Chima,
C. O. : Planning, administration |
|
Narrative Description of
Project: This project involved waste segregation,
packaging and labelling, disposal in Government approved
dumpsite . |
|
Remark: Completed |
|
Description
of actual services provided by The Initiates Ltd staff (as
above) |
| |
|
|
Names of reference
1. Samuel Umana
Tel:082-443523
2. Yusuf Mohammed
Tel. 01-2621740
Treatment and Disposal of Spent Oil and Fuel filters: NLNG
|
Assignment Name: Treatment and disposal of Spent
fuel & Oil Filters |
Country:
Nigeria |
|
Location within Country: Bonny, Rivers state |
Professional Staff Provided by Firm/Entity:
The Initiates ltd |
|
Name of
Client: NLNG |
No. of
Staff: 2 |
|
Address: Bonny |
Staff
Months: 0.1
Duration Of Assignment: Running contract |
|
Start
Date (month/year)
2009 |
Completion Date (month/year) Running contract |
Approx. value of services
(in current Naira):
depends on waste generated
|
|
Name Of
Associate Consultants, If Any: Nil |
No. of
months of Professional staff provided by associate
consultants: Nil |
|
Name of
Senior Staff (Project Director (PD)/Co-ordinator,
Team Leader) involved & functions performed: Mr.
Franklin Anama, Nelson Enweliku & Emma Urrah. |
|
Narrative Description of
Project: This project involved the collection
and treatment/disposal of spent filters contaminated
with oil, compositional analysis, fixation matrix
design and fixation of incinerator residue. The
fixation products are construction blocks determined
to have no significant environmental impact through
leachability test. Final recycling of the recovered
metal parts |
|
Remark: Completed |
|
Description of actual services provided by The
Initiates Ltd staff (as above) |
| |
|
|
Name of references
-
Patrick
Asasa, NLNG. Bonny
Phone No.: 08055090017
-
Felix
Uwagboe, NLNG. Bonny
Phone No.: 08039053203
FIXATION OF
BURNT CARBONIZED SAND MATERIAL AT EJEMAH AND SIME REMEDIATION
SITES
|
Assignment
Name: Fixation of carbonised sand material at EJEMAH
& SIME remediation sites |
Country:
Nigeria |
|
Location
within Country: Rivers State
|
Professional Staff Provided by Firm/Entity:
The Initiates Ltd |
|
Name of
Client: SPDC |
No. of
Staff: 14 |
|
Address:
Shell Industrial Area Rumuobiakani, P.O.Box 263 Port
Harcourt, Rivers State |
Staff
months: 6
Duration
of Assignment: 6 months |
|
Start Date
(month/year)
December
2010
|
Completion
Date (Month/Year) Ongoing
|
Approx. value of services (in
=N=): 70,000,000
|
|
Name Of
Associate Consultants, If Any: None |
No. of
months of Professional staff provided by associate
consultants: 14 |
|
Name of
Senior Staff (Project Director (PD)/Co-ordinator, Team
Leader) involved & functions performed: Mr. Franklin
Anama, Samson Opeteh & Edson Akpotha |
|
Narrative Description of
Project: This project involves stabilization and
fixation into bricks and blocks carbonised sandstone
materials |
|
Description
of actual services provided by The Initiates Ltd staff (as
above) |
| |
|
|
Reference
MRS
OKE OGUNS
SPDC
+234 (0) 8070321312

FIXATION OF
BURNT CARBONIZED SAND MATERIAL AT EJEMAH AND SIME REMEDIATION
SITES
SOLID WASTE
COLLECTION AND DISPOSAL SERVICES AT NAOC BASE PHC
|
Assignment
Name: Waste Collection & disposal |
Country:
Nigeria |
|
Location
within Country: Port Harcourt |
Professional Staff Provided by Firm/Entity:
The Initiates ltd |
|
Name of
Client: Nig. Agip Oil Company |
No. of
Staff : 6 |
|
Address:
P.O.Box 923, Mile 4, Port Harcourt. |
Staff
months: 12
Duration
of Assignment: Running contract |
|
Start Date
(month/year)
February
2011 |
Completion
Date (month/year) Running contract |
Approx. value of services (in
current Naira):
Running contract
|
|
Name Of
Associate Consultants, If Any: Nil |
No. of
months of Professional staff provided by associate
consultants: 2 |
|
Name Of
Senior Staff (Project Director (PD)/Co-Ordinator, Team
Leader) Involved & Functions Performed: Mr. Anama
Franklin, Sunny Boroh, Nelson Enweliku |
|
Narrative Description of
Project: This project involves collection and
disposal of waste and the recycling of recyclable waste
streams. |
| |
|
|
Names of reference
1. Mrs Anuforo Ogechi
Tel: 07063992077
2 Mrs. Ada
Tel: 08036816298
Treatment and Disposal of Spent Cartridge & Conical filters:
NLNG
|
Assignment Name: Treatment and disposal of Spent
Cartridge & conical Filters |
Country:
Nigeria |
|
Location within Country: Bonny, Rivers state |
Professional Staff Provided by Firm/Entity:
The Initiates ltd |
|
Name of
Client: NLNG |
No. of
Staff: 2 |
|
Address: Bonny |
Staff
Months: 0.1
Duration Of Assignment: Running contract |
|
Start
Date (month/year)
2009 |
Completion Date (month/year) Running contract |
Approx. value of services
(in current Naira):
depends on waste generated
|
|
Name Of
Associate Consultants, If Any: Nil |
No. of
months of Professional staff provided by associate
consultants: Nil |
|
Name of
Senior Staff (Project Director (PD)/Co-ordinator,
Team Leader) involved & functions performed: Mr.
Franklin Anama, Nelson Enweliku & Emma Urrah. |
|
Narrative Description of
Project: This project involved the collection
and treatment/disposal of spent filters,
compositional analysis of iBA, fixation matrix
design and fixation of IBA. The fixation products
are construction blocks determined to have no
significant environmental impact through
leachability test. The recycling of recovered metal
parts |
|
Remark: Completed |
|
Description of actual services provided by The
Initiates Ltd staff (as above) |
| |
|
|
Name of references
-
Patrick Asasa, NLNG. Bonny
Phone No.: 08055090017
-
Felix Uwagboe, NLNG. Bonny
Phone No.: 08039053203
Treatment and Disposal of Pressurized cans & Refrigerant
Bottles: NLNG
|
Assignment Name: Treatment and disposal of Spent
Cartridge & Oil Filters |
Country:
Nigeria |
|
Location within Country: Bonny, Rivers state |
Professional Staff Provided by Firm/Entity:
The Initiates ltd |
|
Name of
Client: NLNG |
No. of
Staff: 2 |
|
Address: Bonny |
Staff
Months: 0.1
Duration Of Assignment: Running contract |
|
Start
Date (month/year)
2009 |
Completion Date (month/year) Running contract |
Approx. value of services
(in current Naira):
depends on waste generated
|
|
Name Of
Associate Consultants, If Any: Nil |
No. of
months of Professional staff provided by associate
consultants: Nil |
|
Name of
Senior Staff (Project Director (PD)/Co-ordinator,
Team Leader) involved & functions performed: Mr.
Franklin Anama, Nelson Enweliku & Emma Urrah. |
|
Narrative Description of
Project: This project involved the collection
and treatment/disposal of pressurized aerosol cans
and refrigerant bottles in a safe and
environmentally friendly manner coupled with the
recycling of the recovered metal parts. |
|
Remark: Completed |
|
Description of actual services provided by The
Initiates Ltd staff (as above) |
| |
|
|
Name of references
-
Patrick
Asasa, NLNG. Bonny
Phone No.: 08055090017
-
Felix
Uwagboe, NLNG. Bonn
Phone No.: 08039053203
FIXATION OF 350TONS SEWAGE CAKE AND MEDICAL INCINERATOR ASH FOR
SPDC
|
Assignment
Name: Fixation of 350tons sewage cake and medical
incinerator ash for sepcin |
Country:
Nigeria |
|
Location
within Country: Port Harcourt
|
Professional Staff Provided by Firm/Entity:
The Initiates Ltd |
|
Name of
Client: SPDC |
No. of
Staff: 6 |
|
Address:
Shell Industrial Area, Rumuobiakani, P.O.Box 263, Port
Harcourt Rivers State. |
Staff
months: 12
Duration
of Assignment: 12 months |
|
Start Date
(month/year)
June2010
|
Completion
Date (Month/Year) Completed
June, 2011 |
Approx. value of services (in
=N=): 9,462,750.00
|
|
Name Of
Associate Consultants, If Any: Nil |
No. of
months of Professional staff provided by associate
consultants: Nil |
|
Name of
Senior Staff (Project Director (PD)/Co-ordinator, Team
Leader) involved & functions performed: Mr. Franklin
Anama, Ndah charity |
|
Narrative Description of
Project: This project involves carrying out sewage
cake & medical incinerator ash characterisation (leachability
analysis) providing information on processibility,
handling, & presence of heavy metal leachates. Carry out
sewage cake and medical incinerator treatment; undertake
optimization of fixation mix matrix and Engineering test
in line with EGASPIN requirement. |
|
Description
of actual services provided by The Initiates Ltd staff (as
above) |
| |
|
|
Reference
Mr
Igweh Nyebuchi
SPDC (IA) Port Harcourt
+234 8070324686
 |
 |
|
 |
|
FIXATION OF 350TONS
SEWAGE CAKE AND MEDICAL INCINERATOR ASH |
CLEANING
& DECONTAMINATION
|
|
|
OUR NOTABLE CLIENTS INCLUDES
-
Nigerian Liquefied Natural Gas Company Bonny
-
Shell
Petroleum Development Company
-
Nigeria
Agip Oil Company
-
Mobil
Producing Unlimited
-
TOTAL
E&P
-
Niger
Delta Development Commission
-
Michelin Nig. Limited
.:.OUR
POLICIES
The Initiates Limited Is
Dedicated To Effective Quality Control, Occupational And Public Safety, And
Above All Sound Environmental Protection. We Maintain A Corporate Social
Responsibility Strategy Aimed At Maximizing Community Development In All Our
Operations.
.:.OUR
CREED
Our Experience Is Our Resource And Every Job Enriches Our
Resource To Initiate New Ways
|